top of page

PROBLEM SOLVING EASILY

Writer's pictureAdams

AERIAL MAINS DAMAGED

Updated: Dec 17, 2021

THE PROBLEM:

Adams received a call that scaffolders had damaged the aerial mains on a property at 4.50 pm on a Friday.


ADAMS' SOLUTION

Adams managed to get to the site, replace the mains entry box, and then have the aerial mains inspected by an electrical inspector.


Adams had the power back on before 6 pm the same day.


Problem solving easily.


28 views0 comments

Recent Posts

See All

LINT

Comentários


bottom of page