THE PROBLEM:
There was a significant issue for a community hall. There was a constant surcharge happening to the wastewater treatment plant and drainage system (basically too much sewage at one time, and the treatment plant could not cope with the flows to treat it, so it overflowed onto the ground).
ADAMS' SOLUTION:
Adams came up with a plan to install another septic tank and a 2000L pump chamber/holding tank to store the surcharge. This now pumps the surcharge into the treatment plant over a 24hr period to be processed correctly. No more overflowing drainage!